Calculator formulas

Every formula behind the LowVoltKit calculators, on one sheet.

How to use this guide

Each section matches a calculator and ends with a worked example you can check against it.

SymbolMeaningUnit
VVoltagevolts (V)
ICurrentamps (A)
RResistanceohms (Ω)
PPowerwatts (W)
LOne-way cable lengthfeet (ft) unless noted
R/kftConductor resistance per 1,000 ftΩ
nConductors paralleled per legcount
fLens focal length, or frequencymm, or Hz

Field estimate only. Manufacturer data, the authority having jurisdiction (AHJ), and current applicable code govern material and whether a circuit is energized. See the disclaimer.

Ohm's law and power

Every power calculation in this guide reduces to these four relationships.

V = I × R    I = V ÷ R    R = V ÷ I

P = V × I    P = I2 × R    P = V2 ÷ R    I = P ÷ V

ConvertFormula
mA to AmA ÷ 1,000
W to AW ÷ system V
Series resistanceR1 + R2 + R3 …
Parallel, identical conductorsR ÷ n
Batteries in seriesVoltage adds, Ah stays the same
Batteries in parallelAh adds, voltage stays the same

Voltage drop

Drop is the round trip: two legs of the same gauge, so the one-way length is doubled.

Vdrop = (2 × L × I × (R/kft)) ÷ (1000 × n)

Vdevice = Vsupply reading − Vdrop   % drop = (Vdrop ÷ Vsupply) × 100

Pass window. Built from the nominal rating, not the meter reading: Vnominal × (1 ± tolerance). At ±10%, 12 VDC is 10.8 to 13.2 V and 24 VDC is 21.6 to 26.4 V.

Room left.

Lmax = ((Vsupply − Vmin) × 1000 × n) ÷ (2 × I × (R/kft))

Imax = ((Vsupply − Vmin) × 1000 × n) ÷ (2 × L × (R/kft))

Corrections to the table value.

RT = R20 × [1 + 0.00393 × (T°C − 20)]

  • Stranded class B: table value × 1.02. Fine-strand or tinned: × 1.08.
  • Paralleling spare conductors divides loop resistance by n (doubling up in 18/4 halves it).
  • AC at these gauges and lengths is treated as purely resistive.
  • Measured drop above calculated: implied loop resistance = measured drop ÷ I. Extra resistance points to a bad splice, damaged conductor, CCA or aluminum, or a longer run than entered.
AWGSolid copper Ω/1,000 ft at 20 °CStranded class B (× 1.02)
2425.6726.18
2216.1416.46
2010.1510.35
186.3856.513
164.0164.096
142.5252.576
121.5881.620
LocationTemperature
Conditioned space68 °F / 20 °C
Attic or rooftop120 °F / 49 °C
Outdoor cold0 °F / −18 °C

Worked example. 24 VDC supply, 0.5 A maglock, 150 ft of 18 AWG stranded: 2 × 150 × 0.5 × 6.513 ÷ 1,000 = 0.98 V drop, 23.02 V at the device. That is inside 21.6 to 26.4 V. Maximum length is 2.4 × 1,000 ÷ (2 × 0.5 × 6.513) = 368.5 ft.

Voltage drop calculator

Low voltage load and supply sizing

Size the supply to peak current times a headroom factor, one supply and one voltage at a time.

Irow = qty × draw    drawA = mA ÷ 1000   or   W ÷ Vsystem

Ipeak = Σ Icontinuous + Σ Imomentary   Idemand = Ipeak × 1.30

Loading % = (Idemand ÷ Isupply rating) × 100    Ptotal = I × Vsystem

Icharging = (Ah × 1.2) ÷ recharge hours

  • Continuous: maglocks, readers, controllers, anything energized while secure.
  • Momentary: fail-secure strikes and other devices energized only while released.
  • The 1.30 headroom factor is an allowance for charging and growth, not a code requirement. Charging current is a separate line and is not added into demand a second time.

Worked example. Four maglocks at 500 mA = 2.0 A continuous. 2.0 × 1.30 = 2.6 A demand. A 3 A supply carries it at 87% loading; a 2.5 A supply does not.

Low voltage load calculator

AC to DC conversion

A meter reads RMS, a filter capacitor charges to the peak, and each diode in the current path costs a fixed drop.

Vpeak = VRMS × 1.4142    VRMS = Vpeak × 0.7071

VDC, filtered = Vpeak − (Ndiodes × Vd)

VDC, unfiltered full wave = 0.6366 × Vpeak − (Ndiodes × Vd)

VDC, half wave = 0.3183 × Vpeak − Vd

VRMS required = (VDC required + (Ndiodes × Vd)) ÷ 1.4142

Vunloaded secondary = VRMS × (1 + regulation %)

Vripple, p-p ≈ Iload ÷ (fripple × C)

ItemValue
Diodes in path, bridge2
Diodes in path, center-tap or single diode1
Silicon diode drop0.7 V
Schottky diode drop0.3 V
Ripple frequency, full wave2 × line (120 Hz on 60 Hz)
Ripple frequency, half waveline (60 Hz)

Ripple valley = VDC − Vripple. A device that needs a minimum DC can fall out of spec at the valley even when the average looks fine.

Worked example. 24 VAC through a silicon bridge and a filter capacitor: 24 × 1.4142 = 33.94 V peak, minus 1.4 V of diode drop = 32.54 VDC with no load. At 10% regulation the unloaded secondary is 26.4 VAC, which reads about 35.9 VDC.

AC to DC conversion calculator

Backup battery and UPS sizing

A panel battery is sized in amp-hours at the 20-hour rating; rack equipment is sized in watts and watt-hours.

Panel battery (12 or 24 VDC)

Ahrequired = (Iload × hours) ÷ rate factor    Ahdesign = Ahrequired × 1.25

Icharging available = Isupply rating − Iload

recharge hours = (Ahinstalled × 1.2) ÷ Icharging available

runtime hours = (Ahinstalled × rate factor) ÷ Iload

Discharge timeRate factor (fraction of 20-hour Ah)
20 h1.00
1 h0.60

Other durations: use the battery datasheet's discharge table. Capacity also falls with age and cold.

  • Batteries in series add voltage, not capacity. Two 12 V 7 Ah batteries are a 24 V 7 Ah bank.
  • A 7 Ah battery is 7 Ah over 20 hours and closer to 4 Ah over one hour.
  • If available charging current is zero or negative, the supply cannot recharge the battery under load.

Equipment UPS

VA = (Wload × headroom) ÷ power factor

Whbattery = (Wload × hours) ÷ (efficiency × DoD × derate)

Whusable = Wpublished × hourspublished   runtime ≈ Whusable ÷ Wload

Inverter efficiency defaults to 0.85. The chart-point estimate is a straight line; runtime falls faster than linear at higher loads, so the manufacturer's runtime chart governs.

Worked example. 24 VDC panel at 3.75 A for 1 hour: 3.75 × 1 ÷ 0.60 = 6.25 Ah, × 1.25 = 7.81 Ah. An 8 Ah battery covers it; a 7 Ah does not. On a 4 A supply, 0.25 A is left for charging, so a 7 Ah battery takes 7 × 1.2 ÷ 0.25 = 33.6 hours to recharge.

UPS and backup battery calculator

Video bandwidth

Start from the H.264 table value at 30 fps, then scale for frame rate, codec, and smart codec.

Mbpscamera = MbpsH.264 @ 30 fps × (fps ÷ 30)0.75 × codec factor × smart factor

Mbpsgroup = Mbpscamera × lenses × qty    Mbpslink = Σ Mbps × (1 + headroom)

MbpsMJPEG = (KBframe × fps × 8) ÷ 1000

GB/hour = (Mbps × 3600) ÷ (8 × 1000)    GB/day = (Mbps × 86400) ÷ (8 × 1000)

FactorValue
H.2641.00
H.2650.55
Smart codec / dynamic GOP× 0.60
1080p, medium activity, H.264, 30 fps4.0 Mbps
MJPEG 1080p, medium quality130 KB per frame
Network headroom20%, 25%, or 30%
LinkCable for a 100 m channel
100 Mbps, 1 GbpsCat5e or better
2.5 GbpsCat5e or better
10 GbpsCat6A (Cat6 only to about 37 to 55 m)

Utilization = traffic with headroom ÷ link speed. Figure recording (cameras to recorder), local viewing, and remote viewing (WAN upload) as three separate segments.

Worked example. 20 cameras at 1080p, 30 fps, H.264, medium activity: 20 × 4.0 = 80 Mbps, or 100 Mbps with 25% headroom. That is 80 × 86,400 ÷ 8,000 = 864 GB per day. On H.265 it is 80 × 0.55 = 44 Mbps.

Video bandwidth calculator

Video storage and RAID

Storage is daily volume times retention, plus overhead, figured per camera group and summed.

GB/day = ((Mbps × 86400) ÷ (8 × 1000)) × recording share

TBraw = Σ (GB/day × retention days) ÷ 1000    TBusable required = TBraw × (1 + overhead)

TiB = TB × (10004 ÷ 10244) = TB × 0.9095

retention delivered = (TBusable array ÷ (1 + overhead)) ÷ (TB/day)

Recording modeRecording share
Continuous1.00
Motionpercent of the day writing (40% = 0.40)
Schedule(hours per day ÷ 24) × (days per week ÷ 7)
RAIDUsable capacity (n drives of size d)Minimum drives
RAID 0n × d2
RAID 1d (mirrored pair)2
RAID 5(n − 1) × d3
RAID 6(n − 2) × d4
RAID 10(n ÷ 2) × d4

A hot spare adds one physical drive that holds no data. Default overhead for file system and VMS database is 10%. Drives are sold in decimal TB; the operating system reports TiB.

Worked example. 864 GB per day for 30 days = 25.92 TB raw. With 10% overhead, 28.5 TB usable required (25.9 TiB). Six 8 TB drives in RAID 6 give (6 − 2) × 8 = 32 TB usable, which holds 32 ÷ 1.1 ÷ 0.864 = 33.7 days.

Video storage calculator

Field of view and DORI

Pixel density sets what a camera can do at a distance; the same pixels spread over a wider scene as distance grows.

HFOV = 2 × arctan(sensor width ÷ (2 × f))

VFOV = 2 × arctan(tan(HFOV ÷ 2) × 9 ÷ 16)

scene width = 2 × D × tan(HFOV ÷ 2) = (D × sensor width) ÷ f

scene height = scene width × 9 ÷ 16

px/ft = horizontal px ÷ scene widthft    px/m = px/ft × 3.2808

Dlevel = horizontal px ÷ (thresholdpx/ft × 2 × tan(HFOV ÷ 2))

fneeded = (threshold × sensor width × D) ÷ horizontal px

Use the 9/16 ratio for 16:9; use 3/4 for 4:3. With a datasheet angle, use it directly in place of the arctan calculation. Default sensor width is 5.37 mm (typical 1/2.8 in).

IEC 62676-4 levelpx/mpx/ftMeaning
Detect257.6Something is there
Observe6319.2Can follow what it is doing
Recognise12538.1Probably someone known
Identify25076.2That is the person

Mounting geometry (flat, level ground; h = mounting height):

near edge = h ÷ tan(tilt + VFOV ÷ 2)

center = h ÷ tan(tilt)

far edge = h ÷ tan(tilt − VFOV ÷ 2)

The far edge is unbounded when tilt − VFOV/2 is at or above horizontal. License plates are not a DORI level; they need far more density plus correct lighting, angle, and shutter.

Worked example. 4 mm lens, 5.37 mm sensor, 1920 px: HFOV = 67.7°. At 30 ft the scene is 30 × 5.37 ÷ 4 = 40.3 ft wide, 1920 ÷ 40.3 = 47.7 px/ft (Recognise). Identify reaches 1920 ÷ (76.2 × 1.3425) = 18.8 ft; Detect reaches 187.7 ft.

Field of view and DORI calculator

Conduit fill

Fill is total cable area over conduit internal area, held to the NEC Chapter 9 Table 1 limit for the cable count.

Acable = π × (OD ÷ 2)2 = 0.7854 × OD2

fill % = (Σ (qty × Acable) ÷ Aconduit) × 100

cables remaining = ((Aconduit × limit) − Σ A) ÷ Acable

Cables in conduitNEC Ch. 9 Table 1 limit
153%
231%
3 or more40%
Trade sizeEMT total area (sq in)EMT at 40%PVC Sch 40 total area (sq in)PVC Sch 40 at 40%
1/20.3040.1220.2850.114
3/40.5330.2130.5080.203
10.8640.3460.8320.333
1-1/41.4960.5981.4530.581
1-1/22.0360.8141.9860.794
23.3561.3423.2911.316
2-1/25.8582.3434.6951.878
38.8463.5387.2682.907
3-1/211.5454.6189.7373.895
414.7535.90112.5545.022

Source: NEC Chapter 9 Table 4. Confirm against the edition your AHJ enforces.

  • Jam ratio. Three same-size cables can wedge at a bend when conduit ID ÷ cable OD falls between 2.8 and 3.2.
  • Total bends between pull points are commonly held to 360°.
  • Use the top of the cable's published OD range unless the datasheet is in hand.

Worked example. 24 Cat6 at 0.250 in OD: 0.0491 sq in each, 1.178 sq in total. In 1-1/2 in EMT that is 1.178 ÷ 2.036 = 57.9%, over the 40% limit. In 2 in EMT it is 1.178 ÷ 3.356 = 35.1%, which passes.

Conduit fill calculator

Cable tray and J-hook capacity

Check area and weight separately; whichever reaches its limit first governs, and above a ceiling that is usually weight.

Area

Atray = width × loading depth    AJ-hook = π × (opening ÷ 2)2

Aallowed = Apathway × design fill    max cables = Aallowed ÷ Acable

bundle depth = Σ Acable ÷ width

Weight

lb/ft = Σ (qty × lb/kft) ÷ 1000    lb per hook = lb/ft × hook spacingft

% of tray rating = (lb/ft ÷ rated lb/ft) × 100    kg/km = lb/kft × 1.488

  • Design fill is a design choice (25%, 40%, or 50%), following TIA and BICSI practice and the tray rating. NEC tray fill tables are for power conductors.
  • Many installers cap a bundle near 24 cables and dress bundles side by side.
  • Support spacing is commonly 4 to 5 ft, independent of the ceiling grid.
  • J-hook catalog cable counts govern over the geometric figure.

Worked example. A 12 in × 4 in usable tray is 48 sq in. At 50% fill that allows 24 sq in, about 488 Cat6 at 0.0491 sq in each. At about 28 lb/kft that bundle is 13.7 lb/ft. On J-hooks at 4 ft, each hook carries about 55 lb.

Cable tray and J-hook calculator

Fiber link loss budget

Total loss is fiber length times attenuation, plus every mated pair and every splice.

lossdB = (Lkm × dB/km) + (pairs × dBpair) + (splices × dBsplice)

power budget = PTx − PRx sensitivity   margin = power budget − lossdB ≥ 3 dB

km = m ÷ 1000 = ft ÷ 3280.84

FiberWavelengthAttenuation (dB/km)
Multimode OM3 / OM4850 nm3.5
Multimode OM3 / OM41300 nm1.5
Single-mode OS21310 nm0.4
Single-mode OS21550 nm0.3
ComponentTIA maximum (dB)Typical field (dB)
Mated connector pair0.750.3
Fusion splice0.30.1
Mechanical splice0.3higher than fusion
  • Each patch panel the link passes through is one mated pair. A switch-to-switch link through two panels is two pairs.
  • Certification is judged against the TIA maximum. Typical values show what a clean run often reads.
  • Dirty end faces are the most common cause of a failed test. Clean and inspect before troubleshooting.

Worked example. 300 m of OM4 at 850 nm, two pairs, one fusion splice: (0.3 × 3.5) + (2 × 0.75) + 0.3 = 2.85 dB maximum. On typical values: 1.05 + 0.6 + 0.1 = 1.75 dB.

Fiber link loss calculator

Subnet and CIDR (IPv4)

The prefix sets the block size; the first address is the network, the last is the broadcast, and everything between is usable.

total addresses = 2(32 − prefix)    usable = total − 2

network = IP AND mask    broadcast = network OR wildcard    wildcard octet = 255 − mask octet

Exceptions: a /31 has 2 usable addresses on a point-to-point link (RFC 3021); a /32 is a single host.

PrefixMaskWildcardTotalUsable
/22255.255.252.00.0.3.2551,0241,022
/23255.255.254.00.0.1.255512510
/24255.255.255.00.0.0.255256254
/25255.255.255.1280.0.0.127128126
/26255.255.255.1920.0.0.636462
/27255.255.255.2240.0.0.313230
/28255.255.255.2400.0.0.151614
/29255.255.255.2480.0.0.786
/30255.255.255.2520.0.0.342
RFC 1918 private rangeBlock
10.0.0.0 to 10.255.255.25510.0.0.0/8
172.16.0.0 to 172.31.255.255172.16.0.0/12
192.168.0.0 to 192.168.255.255192.168.0.0/16

Keep static device addresses outside the DHCP pool, and confirm the plan with IT before addressing cameras or controllers.

Worked example. 192.168.1.0/27: mask 255.255.255.224, 25 = 32 addresses. Network 192.168.1.0, broadcast 192.168.1.31, usable 192.168.1.1 through 192.168.1.30 (30 hosts).

Subnet and CIDR calculator

PoE budget and distance

The switch budget is spent at the class PSE figure, not the sum of device datasheets.

Wreserved = Σ (qty × WPSE class)    Wremaining = Wbudget − Wreserved

headroom limit = Wbudget × 0.80    % of budget = (Wreserved ÷ Wbudget) × 100

Cable loss on one run

I = WPSE ÷ VPSE    Rloop = (2 × Lft × (R/kft)) ÷ (1000 × c)

Wloss = I2 × Rloop    Wdevice = WPSE − Wloss

c = conductors per polarity: 2 on two-pair PoE, 4 on four-pair (802.3bt). VPSE = 44 V for Type 1, 50 V for Type 2 and above. Copper: 24 AWG 25.67 Ω/kft, 23 AWG 20.36 Ω/kft.

ClassStandardTypePairsPSE output (W)PD guaranteed (W)
0802.3af1215.412.95
1802.3af124.03.84
2802.3af127.06.49
3802.3af1215.412.95
4802.3at2230.025.5
5802.3bt3445.040.0
6802.3bt3460.051.0
7802.3bt4475.062.0
8802.3bt4490.071.3
  • The 100 m channel (90 m horizontal plus 10 m of cords) is a data limit, not a power limit. Past it, use a PoE extender, a media converter with local power, or fiber with an injector at the far end.
  • Port count and watt budget are separate limits. Some switches allocate by class, others by measured draw; the switch datasheet governs.

Worked example. Eight Class 4 cameras reserve 8 × 30 = 240 W. On a 370 W switch that leaves 130 W at 64.9% of budget, inside the 296 W headroom limit. One 90 m run of 24 AWG: I = 30 ÷ 50 = 0.6 A, Rloop = 2 × 295.3 × 25.67 ÷ (1,000 × 2) = 7.58 Ω, loss = 0.62 × 7.58 = 2.73 W, so about 27.3 W reaches the device.

PoE budget and distance calculator

Unit conversions and EOL resistor color code

FromToMultiply by
FeetMetres0.3048
MetresFeet3.2808
InchesMillimetres25.4
°F°C(°F − 32) ÷ 1.8
°C°F(°C × 1.8) + 32
lb/1,000 ftkg/km1.488
TB (decimal)TiB0.9095
Mbps sustainedGB per day10.8
WattsBTU/h (rack heat)3.412
px/ftpx/m3.2808

Resistor value = (first band digit, second band digit) × 10(third band). Fourth band is tolerance: gold ±5%, silver ±10%.

ColorDigitMultiplier
Black0× 1
Brown1× 10
Red2× 100
Orange3× 1k
Yellow4× 10k
Green5× 100k
Blue6× 1M
Violet7× 10M
Gray8
White9
Gold× 0.1
Common EOL valueBands
1 kΩBrown, black, red
2.2 kΩRed, red, red
4.7 kΩYellow, violet, red
5.6 kΩGreen, blue, red
10 kΩBrown, black, orange

The required value on a supervised zone comes from the panel documentation.

EOL resistor color code

Sources