Estimating
Posts in this pillar.
Estimating
Estimating low voltage work, part 5: building the bidHow to turn the takeoff, the question log, and the RFI answers into a priced, reconciled bid using current material pricing and labor units calibrated to the crews doing the work.2026-10-17
Estimating
Estimating low voltage work, part 4: handling the questionsHow to decide which questions go to an RFI and which belong in the proposal as a clarification, an exclusion, or a separately priced line.2026-10-16
Estimating
Estimating low voltage work, part 3: doing takeoffsHow to time a takeoff around the RFI deadlines, organize the plan set, count devices, measure cable and pathway, and log the questions that come up along the way.2026-10-15
Estimating
Estimating low voltage work, part 2: deciding which jobs to bidHow to use Division 01, the system specifications, and the project's financial terms to decide whether a job is worth the time to bid.2026-10-14
Estimating
Estimating low voltage work, part 1: the software an estimate runs onPlan rooms, takeoff software, Bluebeam, diagramming tools, CAD, spreadsheets, and AI, and what each one does in the estimating process.2026-10-13